Skip to main content
Advanced Search

Filters: partyWithName: U.S. Environmental Protection Agency Region 2 (X)

3 results (7ms)   

Filters
Date Range
Extensions
Types
Contacts
Categories
Tag Types
Tag Schemes
View Results as: JSON ATOM CSV
Description of Work Since 2010, connecting channels have been included in each of the Great Lakes’ Lake Management Plans (LaMPs). Lake Ontario now includes both the Niagara River and the St. Lawrence River. The Niagara River is well characterized by a number of long-term programs, but because of the lack of tributary water-quality data, the St. Lawrence River and its tributaries constitute a data gap in the information needed for the Lake Ontario to fulfill its goals. Critical information needs, including basic water-quality parameters, total suspended solids, nutrients and flow data. These data are needed to aid in the identification of sources of nutrient and sediment loading to the St. Lawrence. The monitoring...
thumbnail
Description of Work The Great Lakes ecosystem has undergone major changes over the last two decades related to the invasion of Dreissenid mussels, increased water clarity, increased benthic algae and associated water quality problems. For reasons not yet entirely understood, and that have bi-national significance, water column total phosphorus has not significantly increased over the last decade but the relative percent of the more biologically available dissolved phosphorus has increased. The filtering action of Dreissenid mussels has been shown to increase concentrations of dissolved phosphorus in the water column immediately above mussel beds and this had been hypothesized as one explanation for the increase...
thumbnail
Description of Work This project is designed to (1) collect more frequent total suspended sediment (TSS) and total phosphorous (TP) data for the Genesee River Watershed, especially sub-watersheds at the 12-digit HUC (Hydrologic Unit code) scale, both within and outside of the AOC; and (2) to conduct a pilot study capable of evaluating the reduction in sediments and nutrients from the current and proposed GLRI non-point source reduction projects in the watershed aggregated at the 12-digit HUC. This project is envisioned as a two-year pilot for the Genesee River Watershed, with potentially wider applications in the Lake Ontario Basin and other Great Lake areas.


    map background search result map search result map Understanding Nutrient Loading Impacts on Lake Ontario Nearshore Waters at the Niagara River Connecting Channel Genesee River BUI / Genesee River Watershed: TSS and TP loading collection and Pilot Project to Evaluate Aggregate BMP Effectiveness Understanding Nutrient Loading Impacts on Lake Ontario Nearshore Waters at the Niagara River Connecting Channel Genesee River BUI / Genesee River Watershed: TSS and TP loading collection and Pilot Project to Evaluate Aggregate BMP Effectiveness