Skip to main content
Advanced Search

Folders: ROOT > ScienceBase Catalog > USGS Data Release Products > Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016 ( Show direct descendants )

5 results (10ms)   

Location

Folder
ROOT
_ScienceBase Catalog
__USGS Data Release Products
___Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016
View Results as: JSON ATOM CSV
thumbnail
In 2016, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and six fully-loaded barges, transited the EDBS in both upstream-bound (n = 23) and downstream-bound (n = 22) directions. A 1,200 kHz Teledyne RDI Channel Master Acoustic Doppler Velocity Meter (ADVM) was mounted on the barge at the position of the rake-to-box junction. The ADVM faced outward from...
thumbnail
In 2016, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and six fully-loaded barges, transited the EDBS in both upstream-bound (n = 23) and downstream-bound (n = 22) directions. A 3,000 kHz SonTek Argonaut SW Acoustic Doppler Velocity Meter (ADVM) was mounted on the barge at the position of the rake-to-box junction. The ADVM faced outward from the side...
thumbnail
In 2016, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and six fully-loaded barges, transited the EDBS in both upstream-bound (n = 23) and downstream-bound (n = 22) directions. A 600 kHz Teledyne RDI Channel Master Acoustic Doppler Velocity Meter (ADVM), was mounted on the west canal wall at a depth of approximately 5.5 feet (1.7 meters), as measured...
thumbnail
In 2016, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and six fully-loaded barges, transited the EDBS in both upstream-bound (n = 23) and downstream-bound (n = 22) directions. A 600 kHz Teledyne RDI Channel Master Acoustic Doppler Velocity Meter (ADVM), was mounted on the west canal wall at a depth of approximately 5.5 feet (1.7 meters), as measured...
thumbnail
In 2016, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and six fully-loaded barges, transited the EDBS in both upstream-bound (n = 23) and downstream-bound (n = 22) directions. A 3,000 kHz SonTek Argonaut SW Acoustic Doppler Velocity Meter (ADVM), was mounted on the west canal wall at a depth of approximately 5.5 feet (1.7 meters), as measured on August...


    map background search result map search result map Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Ambient Velocity Measurements Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Barge Mounted Channel Master Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Barge Mounted Argonaut SW Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Wall Mounted Channel Master Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Wall Mounted Argonaut SW Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Ambient Velocity Measurements Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Barge Mounted Channel Master Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Barge Mounted Argonaut SW Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Wall Mounted Channel Master Velocity profiling at the US Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully loaded commercial tows in August 2016: Wall Mounted Argonaut SW