Filters: Tags: Mentasta Pass (X)
1 result (9ms)
Filters
Date Range
Contacts
Tag Types Tag Schemes |
The Tok electromagnetic and magnetic airborne geophysical survey data were acquired with a DIGHEMv Electromagnetic (EM) system and a CGG D1344 cesium magnetometer with a Scintrex CS3 cesium sensor. The EM and magnetic sensors were flown at a height of 30 meters (m). In addition the survey recorded data from radar and laser altimeters, a GPS navigation system, 50/60 Hz monitors and a video camera. Flights were performed with an AS-350-B3 Squirrel helicopter at a mean terrain clearance of 60 m along NE-SW (12 degrees) survey flight lines with a spacing of 400 m. Tie lines were flown perpendicular to the flight lines at intervals of approximately 4,800 m. These data were produced under contract between the State of...
|
|