Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Run Information
Dates
Publication Date
2017-12-22
Time Period
2017-08-01
Time Period
2017-08-02
Time Period
2017-08-03
Time Period
2017-08-04
Time Period
2017-08-07
Time Period
2017-08-08
Time Period
2017-08-09
Time Period
2017-08-10
Time Period
2017-08-11
Citation
LeRoy, J.Z., Jackson, P.R., Murphy, E.A., and Engel, F.L., 2017, Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: U.S. Geological Survey data release, https://doi.org/10.5066/F77D2TB3.
Summary
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. Wall-mounted velocity probes were located at (41.6423629, -88.060329). The configuration of the barges for each run, and the time at which the bow and stern of the tow pass the wall-mounted velocity [...]
Summary
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. Wall-mounted velocity probes were located at (41.6423629, -88.060329). The configuration of the barges for each run, and the time at which the bow and stern of the tow pass the wall-mounted velocity probes are provided in this Comma Separated Value (CSV) file.
Click on title to download individual files attached to this item.
2017_Run_Information_Metadata.xml Original FGDC Metadata
View
11.08 KB
application/fgdc+xml
2017_Run_Information.csv
5.37 KB
text/csv
Purpose
Data were obtained to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage.