Data for assessment of the containment pond sediment at Canyon Mine 2018
Dates
Publication Date
2019-03-15
Time Period
2018
Revision
2019-07-18
Citation
Cleveland, D.M., and Hinck, J.E., 2019, Data for assessment of the containment pond at Canyon Mine 2017-2018 (ver. 2.0, July 2019): U.S. Geological Survey data release, https://doi.org/10.5066/P9GD4MV2.
Summary
These data are comprised of measurements of elements (e.g., uranium, cobalt, nickel, copper, zinc, cadmium, lead, etc.), carbon, and particle size determination in Canyon Mine containment pond sediment samples collected in calendar year 2018. First posted: March 15, 2019 Revised: July 18, 2019
Summary
These data are comprised of measurements of elements (e.g., uranium, cobalt, nickel, copper, zinc, cadmium, lead, etc.), carbon, and particle size determination in Canyon Mine containment pond sediment samples collected in calendar year 2018.
First posted: March 15, 2019
Revised: July 18, 2019
These results are part of an ongoing study on the temporal variation in chemistry of the containment pond at Canyon Uranium Mine, near Tusayan, Arizona USA. Results are reflective of pond conditions at the time of collection.
Revision 2.0 by Danielle Cleveland on July 18, 2019. To review the changes that were made, see “Version History for 10.5066_P9GD4MV2.docx” in the attached files section.