Skip to main content

Bridge-Site Study Data for Selected Highway Crossings in Mississippi, 2023

Dates

Publication Date
Start Date
2022-07-01
End Date
2023-06-30

Citation

Storm, J.B., 2024, Bridge-Site Study Data for Selected Highway Crossings in Mississippi, 2023: U.S. Geological Survey data release, https://doi.org/10.5066/P13RCNQK.

Summary

The U.S. Geological Survey (USGS) works closely with the Mississippi Department of Transportation (MDOT) to provide information to be used by the MDOT for design of highway-drainage structures. MDOT spends millions of dollars annually for highway construction. Streamflow records, hydrologic analyses of basins, and hydraulic analyses of flooding potential at proposed highway crossings help the MDOT to make more informed decisions on the use of highway construction funding. Flood-frequency and hydraulic characteristics at highway crossings are determined from historical flood-elevation data recovered by the USGS, cross-section data, and correlations with data from nearby gaging stations. Additional streamflow data are collected for ungaged [...]

Contacts

Point of Contact :
John B Storm
Originator :
John B Storm
Metadata Contact :
John B Storm
Publisher :
U.S. Geological Survey
Data Owner :
Lower Mississippi-Gulf Water Science Center
SDC Data Owner :
Lower Mississippi-Gulf Water Science Center
USGS Mission Area :
Water Resources
Distributor :
U.S. Geological Survey - ScienceBase

Attached Files

Click on title to download individual files attached to this item.

MDOT_Bridge_Sites_2023.csv
“csv data file”
9.72 KB text/csv
MDOT_Bridge_Sites_2023.xml
“metadata”
Original FGDC Metadata

View
42.76 KB application/fgdc+xml
MDOT_Bridge_Sites_2023.zip
“ArcGIS shapefiles”
14.83 KB application/zip
WSPRO_2023.zip
“WSPRO model files”
29.03 KB application/zip
WSPRO_Readme.txt
“WSPRO readme file”
1.69 KB text/plain

Purpose

The purpose of this data release is to present selected basin characteristics and estimates of eight flood-frequency peak streamflows with corresponding water-surface elevations for exceedance probabilities of 50, 20, 10, 4, 2, 1, 0.5, and 0.2 percent that correspond to recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years, respectively, for twenty-eight sites in Mississippi that were studied during the State fiscal year 2023 (July 1, 2022, to June 30, 2023). Bridge-site studies are funded by a cooperative program with the Mississippi Department of Transportation.

Additional Information

Identifiers

Type Scheme Key
DOI https://www.sciencebase.gov/vocab/category/item/identifier doi:10.5066/P13RCNQK

Item Actions

View Item as ...

Save Item as ...

View Item...