Skip to main content
Advanced Search

Folders: ROOT > ScienceBase Catalog > USGS Central Midwest Water Science Center > Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017 ( Show direct descendants )

4 results (60ms)   

Location

Folder
ROOT
_ScienceBase Catalog
__USGS Central Midwest Water Science Center
___Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017
View Results as: JSON ATOM CSV
thumbnail
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. A 600 kHz Teledyne RDI Channel Master Acoustic Doppler Velocity Meter (ADVM), was mounted on the west canal wall at a depth of approximately 5.5 feet (1.7 meters), as measured on...
thumbnail
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. The configuration of the barges for each run is provided in 2017_Run_Information.csv. A 3000 kHz SonTek Argonaut SW Acoustic Doppler Velocity Meter (ADVM), was mounted on the west...
thumbnail
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. Wall-mounted velocity probes were located at (41.6423629, -88.060329). The configuration of the barges for each run, and the time at which the bow and stern of the tow pass the wall-mounted...
thumbnail
In 2017, the U.S. Fish and Wildlife Service, U.S. Geological Survey, and U.S. Army Corps of Engineers undertook a large-scale interagency field study to determine the influence of commercial barge vessels on the efficacy of the Electric Dispersal Barrier System (EDBS) in the Chicago Sanitary and Ship Canal (CSSC) in preventing fish passage. This study included a series of trials in which a tow, consisting of a tug vessel and fully-loaded barges, transited the EDBS in both upstream-bound (n = 65) and downstream-bound (n = 66) directions. The configuration of the barges for each run is provided in 2017_Run_Information.csv. A 600 kHz Teledyne RDI Channel Master Acoustic Doppler Velocity Meter (ADVM), was mounted on...


    map background search result map search result map Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Wall Mounted Channel Master Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Wall Mounted Argonaut SW Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Ambient Velocity Measurements Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Run Information Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Wall Mounted Channel Master Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Wall Mounted Argonaut SW Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Ambient Velocity Measurements Water velocity profiling at the U.S. Army Corps of Engineers Electric Dispersal Barrier in the Chicago Sanitary and Ship Canal during passage of fully-loaded commercial tows in August 2017: Run Information